Pre-finished and fully commissioned Bathroom and Shower Pods
CASE STUDY


Fact File >>
Client:
Holiday Inn
Client Requirement:
3 star Shower pods for Holiday Inn Express
Partner:
Intercontinental Hotels Group
Project Value:
£10 million
Hotel size:
80/120 bedrooms

Holiday Inn
With the hands on experience gained from working with most of the leading European Brand Hotels Gateway can call on a depth of expertise in delivering hotel bathroom pods that is the envy of our competition. Understanding our customer’s brand development strategy and reflecting this in the bathroom design demands a consistently high standard of quality that is difficult to achieve through traditional building methods.

The build time for an 80 bedroom Holiday Inn Express using traditional bathrooms construction was 52 weeks from start to handover. When Gateway pods were introduced into the schedule, the build time was reduced to a 28 week program. This meant that at a standard tariff of £50 per night and 70% occupancy these Holiday Inn Express Hotels generated additional revenue of £67,200.

Email: Info@gatewaypods.co.uk