Pre-finished and fully commissioned Bathroom and Shower Pods
CASE STUDY


Fact File >>
Client:
Greenquarter 6 Residential Manchester
Client Requirement:
580 Bathroom and Shower Pods
Partner:
Crosby Lendlease/Shepherd Construction
Project Value:
£3m

Greenquarter 6 Residential Manchester
Set in the heart of Manchester, Greenquarter 6 is a flagship residential development from Crosby Homes


The 580 Bathroom and Shower pods on this project featured
  • Thermostatic showers
  • Raindance Showerheads
  • Italian Sanitaryware
  • Steel Enamel Baths
  • Fully veneered vanity units
  • Full size Mirrors
  • Counter top basins
    The 580 Bathroom and Shower pods were manufactured and delivered to site over a 6 month period.